My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 033 <br />Date : 05/06/2008 <br />User : JRS <br />Permit/job # : C-81-022 <br />Abbreviation :none <br />Filename : C022-033 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description : Regrade Lower Power Line Access Road <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />Machine description :Cat 330C L <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $45.61 NA Shift basis : 1 per day <br />Operating cost/hour : $61.06 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $139.63 Total fleet cost/hour : $139.63 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,500 CCY factor : 1.125 volume : 8,438 LCY <br />Source of estimated volume :Appendix E-1; Map S-038 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.32 minutes <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />1.12 LCY (heaped) Bucket size class : small <br />0.85 Hard, tough clay (80% - 90%) <br />0.95 LCY <br />Job Condition Correction Factors <br />Site altitude : 6,400 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.945 per LCY <br /> Source <br />Altitude adjustment : 1.00 (Cat Hi3) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />177.94 LCY/hour <br />147.69 LCY/hour <br />147.69 LCY/hour <br />Total job time : 57.13 hours <br />Total job cost : $7,977 <br />
The URL can be used to link to this page
Your browser does not support the video tag.