My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 027 <br />Date : 05/06/2008 <br />User : JRS <br />Agency or organization name :Colorado Division Of Reclamation, <br />Permit or other job action : Pe-mit Renewa105 <br />Task description :Rip All Surface Facility Areas <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />PermiUjob # : C-81-022 <br />Abbreviation :none <br />Filename : C022-027 <br />And Safety <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 90.20 acres Rip depth (ft) : 2.00 Volume : 291,045 BCY or CCY <br /> <br />Source of estimated quantity :Page 2.05-20 <br />Source of estimated load factor :NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,458.87 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 6,200 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feet/pass Job efficiency factor : 0.83 (1 shiff/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.762 acres/hour Adjusted unit production : 2,040.86 cu. yds./hour <br />Unadjusted production : 2,458.87 cu. yds./hour Adjusted fleet production : 6,122.59 cu. yds./hour <br /> <br /> <br />JOB TIME AND COST .............................. <br />Fleet size : 3 dozers) Total job time : 47.54 hours <br />Unit cost : $0.105 per cu. yd. Total job cost : $30,539 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.