My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # : 022 State :Colorado <br />Date : 06-May-2008 <br />User : JRS <br />County :Delta <br />Site : Sanborn Creek Mine Filename : C022-022 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewa105 <br />Task description :Compact All Ungraded Refuse Material <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 815E Horsepower : 240 <br />Compactor type :Soil -tamping foot Shift basis : 1 per day <br />Source of estimated volume :Division Estimate <br />Source of estimated shrinkage factor :CAT Handbook <br />:«.;:: :.::::::::::::::::.::::::::::::.::.:::::::::::.:::::::::::::::::........................................................... . <br />HOURLY PRODUCTION <br />Unadiusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 6,200 feet <br />6.42 feet <br />4.00 mph <br />12.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />5 passes <br />1,004.60 CCY/hr <br />Source <br />Altitude adjustment factor : 1.00 (Cat Hi3) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production <br />833.82 CCY/hr <br />Adjusted hourly fleet production : 833.82 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) <br />Permitfjob # : C-81-022 <br />Abbreviation :none <br />Total job time : 4.64 hours <br />Unit cost $0.160 per CCY Total job cost : $619 <br />
The URL can be used to link to this page
Your browser does not support the video tag.