Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description : Regrade Drill Pads Associated with Technical Revisions 54, 56 and 57 <br />E ~.: . <br />HOU RLY ~;;;;::.. ..................................................................................................................................................................................... <br />..... <br />UIPM ~~~ <br />Q ENT C ~~~~ <br />OST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $622.60 <br />MATERIAL :::::::.................................... <br />QUANTITIES ........................................................... .................................................................. .......................... ................................. <br />Initial Swell Loose <br />volume : 7,800 BCY factor : 1.250 volume : 9,750 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor.: CAT Handbook <br /> <br />PR ... D;•::;.: <br />O UCTI <br />ON~~ <br /> <br /> <br />ob Condition Correction Factors <br /> <br /> <br />ource <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 0.85 (Cat HB) <br />Average push gradient : 7.50 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,600 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.29 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 354.95 LCY/hr <br /> Adjusted fleet production : 1,064.84 LCY/hr <br /> <br />JOB TIME ::::::....................................... <br />AND COST ........................................................... ................................................................. ........................... ................................ <br />Fleet size : 3 Dozers) Total job time : 9.15 Hours <br />Unit cost : $0.585 /LCY Total job cost : $5,701 <br /> <br />