Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description : Backfill and Regrade Primary Riprap Borrow Area <br /> <br />HOURLY :::; :.:.......... .................................................................................................................................................. <br />EQUIPMENT COST ................................. ........................... <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $622.60 <br />MATERIA :::::::..................................................................................................................................................................... <br />L QUANTITIES ................................ ........................... <br />Initial Swell Loose <br />volume : 1,500 CCY factor : 1.165 volume : 1,748 LCY <br /> <br />Source of estimated volume :Map 18 <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br /> <br />..............Job Condition Correction Factors <br />RODUCTI <br />ON <br /> <br />.::.:::::::::::::::::::::::::: <br /> <br />:::"Source;;;;;,: <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.30 (Cat HB) <br />Average push gradient : 30.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.13 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 90.62 LCY/hr <br /> Adjusted fleet production : 271.86 LCY/hr <br />JOB TIME AND:C'::::. T :::::::........................................................................................................................................... <br />OS ................................. ......................... <br />Fleet size : 3 Dozers) Total job time : 6.43 Hours <br />Unit cost : $2.290 /LCY Total job cost : $4,002 <br /> <br />