Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Backfill and Regrade Material Used to Widen Access Road <br />HOURLY :::::. .......... .............................................................................................................................................................................. <br />.. <br />EQUIPMENT COST <br />Basic. machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />volume : 1,600 CCY factor : 1.165 volume : 1,864 LCY <br /> <br />Source of estimated volume :Technical Revision 21 <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY :P::::;.:.... <br />RODUCTI <br />ON _ ..... .................... _ ......... <br /> <br /> <br />........................:::.Job Condition Correction Factors:: <br /> <br /> <br />::::::::::.::::::::::: , , _ _.... <br /> <br /> <br />::::.:::::::::::Source:::.::.:: <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.83 (Cat HB) <br />Average push gradient : 8.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,100 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.30 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earfh Adjusted unit production : 312.85 LCY/hr <br /> Adjusted fleet production : 938.55 LCY/hr <br /> <br />JOB TIME AND:.C;:.;;; ::...................... <br />OST ....................... ..................................... .................................................................. ......................... ................................. <br />Fleet size : 3 Dozers) Total job time : 1.99 Hours <br />Unit cost : $0.663 /LCY Total job cost : $1,237 <br /> <br />