Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />INTEROFFICE <br />MEMORANDUM <br />TO: Marcia Talvitie <br />FROM: Jim Stark <br />SUBJECT: Oxbow PR-OS Cost Estimate <br />DATE: 9 May 2008 <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />- &- <br />SAF ETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Attached is the reclamation cost estimate for the Elk Creek and Sanborn Creek Mine's <br />Permit Renewa105. The estimate is 100 tasks (a summary sheet and tasks OOa-130) and <br />represents a new liability of $4,008,068.00. This new liability is an increase of <br />$134,745.00 over the current liability of $3,873,914.00 and an increase of $96,022.00 <br />over the current bond held of $3,912,042.00. The amount to enter on the appropriate <br />proposed decision coding form is +$96,022.00. <br />This estimate is only an update of costs since the 2006 Midterm Review, dated 11 April <br />2006. Additionally, all the reclamation cost estimates for the Minor Revisions and <br />Technical Revisions that have been approved since the 2006 Midterm Review have been <br />updated and included in this estimate. These Revisions include MR-78, 79, 80 and 81 <br />and TR-54, 56, 57 and 58. <br />The increase in-the mine's liability is due to equipment and material cost increases since <br />the last reclamation cost estimate calculation. No other inputs have been changed. The <br />following chart shows the equipment and riprap cost increases that contributed to the <br />increase in liability. <br />Item Cost Rlv-OS Cost 2006 MTR Cost Difference <br /> <br />Hourl D9R Dozer $ 207.53 $ 194.45 $ 13.08 <br />Hourl 637E Scra er $ 313.18 $ 288.53 $ 24.65 <br />Hourl 330C Excavator $ 139.63 $ 124.74 $ 14.89 <br />Hourl 14H Grader $ 116.18 $ 106.92 $ 9.26 <br />Ri ra -Per Yard $ 66.00 $ 43.10 $ 22.90 <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />