My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (256)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (256)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:05 PM
Creation date
5/8/2008 1:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Valley Leach Facility Phase 5 Extension Design
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~_ <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br />hardening parameters were based on settlement data from the SGOSA, which contains similar <br />materials as the AGOSA. <br />The Carlton Mill tailings were modeled as a stiff sandy soil, with an effective friction angle of 29 <br />degrees and no cohesion. The modulus was set at 4,900 psi, which corresponds to a consolidated <br />tailings based on data presented in Qiu and Sego (2001). These properties are considered <br />appropriate for the tailings, which have been in-place for over 12 years and are covered with 100 <br />to 300 feet of overburden materials. <br />The results of the settlement calculations are presented in Appendix C. The results of the <br />analysis indicate that the anticipated vertical settlements along the regraded AGOSA slopes will <br />likely be less than 12 inches under the applied ore loading. The anticipated strain in the <br />geomembrane liner is estimated to be less than 2 %, therefore the composite liner system will not <br />be impacted by settlement of the AGOSA under the design loads. <br />5.3 Site Surface Hydrology <br />Surface flows resulting from storm events will be controlled and routed around the Phase 5 VLF <br />• using surface-water diversion structures. The size and geometry of the surface-water control <br />structures- are based on storm-water flows from the 100-year/24-hour storm event for both the <br />operational and post closure VLF configuration. <br />There are two primary surface water diversion structures for the Phase 5 VL- F design. One <br />structure is located north of the Phase 5 VLF and consists of a sedimentation pond (see Drawing <br />A510). This pond will collect water diverted from existing surface water channels. The other <br />structure is a diversion channel located along the southeastern edge of the VLF, and will route <br />surface water along Squaw Mountain. <br />The estimated flow volumes and peak flows throughout the site were calculated using the <br />Natural Resources Conservation Service TR-55 method for small watersheds. The total - <br />catchment area during operations along the north end of the VLF is 74 acres, while the <br />catchment for the south end is 9.1 acres. Operational and post closure sub-watershed areas and <br />diversion channel flow paths for the models are shown on Drawings A500 and A610. <br />Mining is a dynamic activity, and the topography within the contributing basins may change <br />daily. From time to time, it may be necessary for CC&V to re-grade areas, super-elevate haul <br />roads, and redirect runoff to other areas. These activities will cause the operational surface-water <br />drainage patterns to be different from those shown on the drawings. The operational sediment <br />S:\PROJECTS\1725 CCBV PHASE 5 VLF\H2 - DESIGNWREQUA VLF\VLF PHASE 5 FINAL REPORT V2.DOC <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.