Laserfiche WebLink
7`1'x.. <br />fftlTN NILLIAtlf [OYfUItAMTf. 111[. <br /> <br />• <br />• <br />PROJECT: JOB NO: SHEET,Z_OF~} <br />Arequa Phase 5 VLF 1125 <br />FEATURE: BY: DATE: <br />Underdrains DTW 2/8/08 <br />DETAILS: CHKD BY: DATE: <br />Underdrnin Capacities ALD 2/19/08 <br />Primary, Secondary and Tertiary Underdrains <br />• Criteria: 1) Underdrnin to be sized for o max flow of 25 gpm based on reported measurements of other <br />springs within the general vicinity <br />• Primary Underdrnin Ar~lysis: <br />Primary Underdrnin extends beneath the PSSA and will discharge into an underdrain pond near <br />the downstream toe of the PSSA, o <br />The minimum grade of the PSSA is 0.5%. A 6" CPE pipe at a 0.5% grade has n capacity of 155 gpm. <br />Therefore, under gravity flow, the primary underdrain capacity is sufficient <br />DEPTH OF STRUCTURAL flLt REQUIRED <br />TO ACHIEVE SOIL LINER FILL SUBGRADE. <br />ELEVATION VARIES <br />l2 oz/yd° NONWOVEN <br />GEOTEXTILE 6" MINIMUM SELECT <br />(2' MINIMUM OVERLAP) STRUCTURAL FILL <br />" <br />4 <br />OIA. CPe PIPE ~ 3' MNIMUM <br />~\ <br />~ <br />UNDERDRAW FILL ^--~ ~ (T <br />_ GRADE VARIES <br />Fes- 5~ MINIMUM -~\` COMPETENT SUBGRADE AS <br />APPROVED B'I ENGINEER <br />• Secondary Underdroin Analysis: <br />Secondary underdrains to be routed into upper reaches above the PSSA <br />Use Leps (1973) and Wilkins (1956) equations for turbulent flow through rockfill to size capcity <br />of secondary underdrain. Rockfill has a D50=6" and fins content of 0-5%. A factor of safety <br />of 5 will be applied to design. Asuume rockfill porosity of 33%nnd o minimum grndinet of 5% <br />(grading plan indicates grading will be much greater than 5%). <br />DEPTH OF STRUCTURAL fILL REQUIRED <br />TO ACHfEVE SOIL LINER FILL SUBGRADE. <br />ELEVATION VARIES <br />12 oz/yd2 NONWOVEN <br />GEOTEX7ILE <br />{2~ MINIMUM OVERLAP) (" MINIMUM SELECT <br />STRUCTURAL FILL <br /> <br />2' MINIMUM <br /> <br />UNDERDRAIN FILL -~ ~ GRADE VARIES <br />F-~~-- 4' M{NIMUM --~ <br />COMPETENT SUBGRADE AS <br />APPROVED BY ENGINEER <br />