Laserfiche WebLink
!~{:~~! <br />fNt17N WILLIAMf CONSULTANTf. INC. <br /> <br /> <br />PROJECT: JOB NO: SHEET~_OF~ <br />Arequa VLF 1125 <br />FEATURE: BY: DATE: <br />High Volume Solution Collection Pipe ALD 1/9/08. <br />DETAILS: CHKD BY: DATE: <br />Secondary Pipe Size DTW 1/26/08 <br />• Criteria: <br /> 1) Size of pipe diameter required for ench section is based on the urea and a pplication rate. <br /> 2) Section D contains only 4" diameter tertiary pipes. <br />• Analysis: <br /> Application rate = 6.68x10 cfs/ft <br />Section Al: <br /> Area = 910,000 ft2 <br /> Slope = 25% <br /> Flow = 910,000 ftz * 6.68x10 cfs/ft = 6.08 cfs = 6.1 cfs <br /> Requires 8" diameter pipe or larger at 25% slope <br />Section A2: <br /> Area = 960,000 ftz <br /> Slope = 11% <br /> Flow = 960,000 ft2 * 6.68x10 cfs/ft = 6.41 cfs = 6.4 cfs <br /> Requires 10" diameter pipe or larger at 11% slope <br />Section B: <br /> Area = 1,890,000 ftZ <br /> Slope = 30% <br /> Flow = 1,890,000 ft2 * 6.68x10 cfs/ft = 12.63 cfs = 12.6 cfs <br /> Requires 10" diameter pipe or lorger at 30% slope <br />Section C: <br /> Area = 1,195,000 ftZ <br /> Slope = 27% <br /> Flow = 1,195,000 ftZ * 6.68x10 cfs/ft = 7.98 cfs = 8.0 cfs <br /> Requires 10" diameter pipe or larger at 27% slope <br />e~ <br />