Laserfiche WebLink
<br />May 2005 ES-2 053-2386 <br />Additional liner load testing was not conducted to evaluate the :Phase I and II PSSA liner systems <br />because geometrical constraints would prevent the stacking of ore in these areas to greater than the <br />designed and approved ore depth of approximately 590 feet. <br />The results of the liner load tests indicate that the current liner systems within the Cresson VLF will <br />perform acceptably under equivalent ore depths in excess of 800 feet. <br />.44 <br /> <br />c so?o?td?aoe Golder Associates