Laserfiche WebLink
• <br />~MITN WII LIAMS <br />CONSULTANTS. INC. <br />Flexible Wall Permeability <br />ASTM 5084-03, Method C <br />• <br />Project Valley Leach Facility Project No. 1125/A100 <br />Lab No. 7-125-14 Date of Test 7/23/2007 <br />Sample No. 7-125-14 Tested By: RS <br />Location SWTP-94 @8' Checked By KE <br /> <br />Type of Sample Remold <br />Sample Specific Gravity 2.627 Specific Gravity Assumed? Yes <br />Initial Dry Density (Ibs/ft3) 113.59 Final Dry Density (Ibs/ft3) 113.03 <br />Initial Moisture Content (%) 13.90 Final Moisture Content (%) 18.2% <br />Moisture Density Test ASTM D698 <br />Maximum Dry Density (Ibs/ft3) 119 Optimum Moisture Content (%) 13.9% <br />Remolded Compaction (%) 95 ± Optimum Moisture Content (%) 4.3 <br />Initial Sample Height (cm) 7.62 Final Sample Height (cm) 7.58 <br />Initial Sample Diameter (cm) 7.28 Final Sample Diameter (cm) 7.28 <br />Initial Saturation 100.00 Final Saturation 100% <br />Manometer Diameter (cm) large 2.00 small 1.00 <br />Backpressure (psi) 0.00 <br />Confining Pressure (psi) 5.00 <br />Average lCsat (cm/sec) 2.42E-07 <br />ap water used as permeant. <br />• <br />