My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (192)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (192)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:03 PM
Creation date
5/6/2008 3:43:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL IV APP 5 Attachment 2 Globe Hill Mine Slope Design
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• GHMXSIopeEvaluation <br />First, only light blasting will be required in the "Very Poor" rock zone (Plate 12). This material is <br />sufficiently friable in core samples to suggest that it could largely be free-dug. Hole loading should be <br />minimized to reduce wall disturbance by bench shots forming the wall. <br />Second, blasting should be performed to minimize disturbance of the final wall, and the final benches. A <br />suggested blast design for final wall and bench locations at GHMX is presented in Plate 13. This design <br />draws on experience in blast testing in the Main Cresson Mine (Itasca, 1999; ABC, 2003), and has been <br />found to be effective in this mining district in highly fractured environments, as well as in intact rock. <br />Features of the blast approach are: <br />1. Light trim or pre-split blasting against the final wall, with close-spaced holes (maximum 5 feet) <br />to ensure that atrim/split line will develop in all rock types. <br />2. Two foot sub-drilling at the toe of the slope to prevent the formation of a hard toe, which results <br />in a "wedge" at the base of the toe that can result in any falling rock being propelled laterally out <br />onto the working level. <br />3. Avoidance of disturbing the next bench crest by: <br />a. Aligning blast hole lines so that the next crest falls equidistant from two blast hole lines. <br />b. Not sub-drilling blast holes on the two lines that straddle the future crest location. <br />• 4. Loading the holes in the vicinity of the final wall and bench as lightly as is consistent with <br />required breakage. <br />Third, the final walls can be formed using trim or pre-split blasting: <br />1. Pre-split. If pre-split blasting to form the wall is chosen, this row should be shot prior to mining <br />on the level from which it is drilled. Bench mining on the same level as the pre-split that is <br />conducted prior to forming the pre-split should maintain a minimum of three parallel rows from <br />the presplit line to ensure good containment of the pre-split blast. The pre-split detonation order <br />should be such as to sweep from one end of the blasthole line to the other. <br />2. Trim. If trim blasting against the wall is chosen, the row should be shot last in the bench round, <br />with delays to result in a sweep blast from one end to the other. <br />4.3 Alluvium/Colluvium Walls <br />Walls in alluvium/colluvium should be excavated so as to obtain an average overall slope of 36 degrees. <br />The method of achieving this design can be determined in the mine. The material could be free-dug with <br />interbench slopes at 40 degrees, 1-foot (nominal) intermediate benches, and a 17.5-foot catch bench <br />every three benches. The slope that will result will be 36°. <br />In the alternative, the alluvium/colluvium could be lightly blasted, with vertical 35-foot drill holes. <br />Upon excavation, the material will likely ravel to an approximately 40° interbench slope, and the above <br />geometry can be created in this fashion. <br />• Both methods of excavation can be achieved safely, and will produce a safe overall slope. <br />Report1385E.20071126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.