Laserfiche WebLink
• MLESIopeDesign <br />5. REFERENCES <br />ABC, 1997. Cresson Mine Slope Stability Evaluation. Report prepared for Pikes Peak Mining Company, <br />October 8, 1997. (Attachment 1 to this report) <br />ABC, 1998. East Cresson Mine Stability Evaluation. Report prepared for Cripple Creek and Victor Gold <br />Mining Company by Adrian Brown Consultants, May, 1998. <br />ABC, 1998a. Cresson Mine Slope Stability Evaluation. Report prepared for Cripple Creek and Victor <br />Gold Mining Company by Adrian Brown Consultants, July 1998. <br />ABC, 1999. Deep Cresson Mine Slope Stability Evaluation. Report prepared for Cripple Creek and <br />Victor Gold Mining Company by Adrian Brown Consultants, March 1999. <br />ABC, 2000. North Cresson Mine Area Slope Stability Evaluation. Report prepared for Cripple Creek <br />and Victor Gold Mining Company by Adrian Brown Consultants, March 2000. <br />ABC, 2003. Cresson Project Slope Review, December 2002. Report prepared for Cripple Creek & <br />Victor Mining Company, dated January 5, 2003 <br />ABC, 2003a. Wild Horse Extension Slope Design. Report prepared for Cripple Creek and Victor Gold <br />Mining Company by Adrian Brown Consultants, September 2003. (Attachment 3 to this report) <br />• ABC, 2004. East Cresson Mine Extension Slope Design. Report prepared for Cripple Creek and Victor <br />Gold Mining Company by Adrian Brown Consultants, May, 2004. <br />ABC, 2007. Globe Hill Mine Slope Design. Report prepared for Cripple Creek and Victor Gold Mining <br />Company by Adrian Brown Consultants, November, 2007. (Attachment 2 to this report) <br />Call and Nicholas, 1994. Cresson Pit Slope Design, East Wall, Report prepared for Pike's Peak Mining <br />Company by Call and Nicholas, January 1994). <br />Itasca, 1999. Slope Stability Assessment of the Cresson Pit: Summary of Conclusions and <br />Recommendations. Report prepared for Cripple Creek and Victor Gold Mining Company by <br />Itasca Consulting Group, July 1999. <br /> <br />Report 1385E.20080411 <br />