Laserfiche WebLink
• <br />LJ <br />• <br />Ground vibration and air overpressure created by blasting at CC&V have always been in <br />compliance. Annoyance has been an issue on occasion however blast effects have never <br />approached the permit levels and are a small percentage of a level that would have any <br />probability of causing damage. Continued vigilant monitoring of blast effects will continue to <br />confirm this outstanding fifteen plus year record of compliance with all applicable regulatory <br />requirements for non-damage and the current permit levels. <br />Sincerely, <br />~- <br />Colin M. Matheson, <br />President, Mining Engineer <br />3 <br />