My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-05_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2008-05-05_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:29:09 PM
Creation date
5/5/2008 11:00:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
5/5/2008
Doc Name
Preliminary Adequacy Review Responses
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR69
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. On the currently approved Map 23A there is a purple area that delineates the <br />Section 16 mining area (the X-Pod area) that was approved with Technical <br />Revision 65. This layer was removed from the new Map 23A, submitted with <br />Technical Revision 69. Please add the layer that delineates the Section 16 <br />mining area (the X-Pod area) that was approved with Technical Revision <br />65 to the new Map 23A submitted with Technical Revision 69. <br />Response: The new Map 23A, approved under TR-65, was superseded by the old <br />Map 23A, submitted and approved under PR-02. The X-Pod mining area is now <br />included in the South Taylor Mine Plan (i.e. Map 23A). Thus the X-Pod mining block <br />has been removed from Map 23A under the approved PR-02 package. <br />2. Both the currently approved Map 23A and the revised.Map 23A show <br />highwall mining areas for the years 2008-2012. Colowyo is reminded that the <br />Division does not currently have an approved plan for highwall mining in the <br />South Taylor Pit. This is the subject of Stipulation 9, which states: <br />Prior to conducting any highwall mining in the South Taylor Pit the <br />Colowyo Coal Company shall submit a TECHNICAL revision to the <br />Division including a mining plan and sequence, a stability analysis and a <br />zero subsidence analysis and plan. Highwall mining may not begin in the <br />South Taylor Pit until the aforementioned revision has been approved by <br />the Division. <br />Response: Should Colowyo commence highwall mining in the South Taylor Pit, <br />Colowyo will submit a proper Technical Revision to the Division to revise the permit <br />prior to commencement of mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.