My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-29_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2008-04-29_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:53 PM
Creation date
5/2/2008 3:28:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REVISION
Doc Date
4/29/2008
Doc Name
Proposed Decision & Findings of Compliance
From
DRMS
To
Lorencito Coal Coal Company
Type & Sequence
SL2
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~PP~vAiX <br />Lorencito Canyon Mine C-1996-084 <br /> <br /> <br />v~-vim ~ ~cic <br />PROJECT IDENTIFICATION <br />_ aaavta nt I tUUi Il <br />_ <br />_ <br />Date : ~ 16-Jan-08 <br />_ <br />P <br />it <br />C <br />96 <br />_ <br />- - - - <br />- -------- <br />ser: RS erm <br />- - - <br />-084 <br />-- Site: Lorencito Canyon Mine <br /> State :Colorado <br />Task: !000 Filename: C084-000 County_Las Animas <br />gency Name: Colorado Division Of Minerals And Geolo <br />---------------------------- gY ~ <br />--- <br />--- ---- - <br />ermit Action: Industrial Land-Use Bond Release SL-02 <br />f- ---- - <br />~ <br />~-- <br /> - --- - -- <br /> <br />Task <br />(Task Description <br />I --- - <br />TASK HOURS DIRECTCOST <br />- 004 _- <br />-- ~ Load and Haul Bed-Coal --- <br />- -------- ---- --- ~ ~ 5 66 $7 <br />551 <br /> <br />020 <br />----- <br />i-Re rade Ditches at Loadout__ ___ _ <br />-g - i-- ------- -- , <br />i-- --- --- -8.55 . <br />- - - - -------- <br />': <br />3 <br />$ <br />867 <br />037 <br />7 -Replace Topsoil from <br />Haul <br />Road Stockpile to Service Area ____ _____ ____________ <br />_ <br />, <br />___________ <br />___ <br />058 <br /> <br />-- _ <br />- <br />________ <br />-- <br />~eplace Topsoil from Loadout Stockpile to Loadout Area _ <br /> <br />-- <br />Deleted - TR- __ _ <br />14 ___ _ _ _0.29; $359 <br />0 <br />00; <br />--- <br />- <br />- <br />- <br />-J <br />$0 <br />_ 070- --- ------- ----------------- <br />'-Hydroseed JeffCanyon Haul Road Steep Embankments <br />--------- -- ----- <br />~ _ <br />~-- ______ <br />. <br />_ _ <br />_ <br />_ <br />__ <br />_ <br />_ _ <br />10.007 $10 582 <br /> <br />_071 - <br />i _Broadcast Seed Jeff Canyon Topsoil Piles__ _ ___ <br />__ __ <br /> <br />--- r - -- - <br /> <br /> <br /> <br />-------~ ~-- -- <br /> <br /> <br /> <br />- ~ <br /> <br /> <br />------------- -- <br />12 00'------------ <br />$9,017 <br />= <br />072 ~-Broadcast Seed Loadout <br />i ___ <br />- --- - <br />- - - - - <br />1.00: <br />$751 <br />082 <br />- - ----- - <br />~-Clean_Loadout Sediment Pond _ <br />-- ---- - ------------------- -- --- <br />I - -- _ <br />16.97 $8 040 <br /> <br /> <br />_ 101___ <br />_--~ <br />Regrade Loadout Area _ _ _-- <br />I <br />- <br />-------- <br />r------- - ----_ -1 _ - - - -- -------- <br /> <br />5.90'' <br />$600 <br />102 - <br />_ <br />- - <br />-Replace Topsoil from Stockpile #1 to Loadout Berm Area ~ __ <br /> <br />- -- <br />I _ <br />~ _____ <br />- <br />10.74 - - $2 196 <br />-- - <br /> <br />- --- (Direct Cost Total <br />--- --- <br /> <br />- <br /> <br />-- <br />54.47' $40 167 <br /> <br /> <br /> <br /> <br />-- ----- INDIRECT COSTS <br /> <br />- ---- <br />' <br /> <br />1 <br />--- - <br /> <br /> <br /> <br /> <br />---- --- - - - --- ---- ------------- --- 11 <br />-- <br />_ <br />_ <br /> <br />-- --- - ------ ---- -- - - <br />--- <br />-- <br /> <br /> <br />-~ <br />- ----- - - -- - <br /> <br /> <br />I <br /> <br />~ ~ ----- <br />- <br />- ---- <br />- ---- <br />j <br /> <br /> <br />~ I <br />Overhead and Profit <br />--- <br />Llabili Insuran <br />1 <br />55% <br />f Di <br />-~ <br />---- _ ----- ---- -- - --- <br />- ce <br />. <br />o <br />rect Costs <br />-- tY--- ( ) <br />-- <br />----- ------------ $623 <br /> <br /> <br />----- -------f <br />u <br />Performance Bond (1.05 /o of Direct Costs) ~ <br />----------------------- ----- --- -----r <br /> <br />~ - <br />-, <br />' - - <br />--- ---- - -'- - --- -- <br />$422 <br /> <br />--- --- --- - --- ---- <br />Job Superintendent (at $36.25/hour) _ _______ _ _ _ <br />i <br />- ------- - --- -------- -- ---------- _.~- -- ----- <br /> <br />27.24 <br />$987 <br />! __ <br />Profit (10.00% of Direct Costs) _ ____ <br />C ~ --- ----- -- <br /> --- - <br />-- _ __-- $4,017 <br /> <br />_ <br /> <br />- - - <br />Total Overhead and Profit <br /> <br />- --- -- - - - - <br /> <br /> <br />---- -------- <br /> <br /> <br />- ----- <br /> <br />----- - _ <br />- - - <br />$6 <br />048 <br />-_ Contract Amount (Direct Costs + Overhead and Profit) ~ ~ , <br />----- --- - <br />$46,215 <br /> Leal - Engineering=Project Mana ement <br />_-___i Engineering Work and ContracbBid Preparation (4.25% of Contract) I <br />------- - -- ~ <br /> <br /> <br />----- <br />Rec amation Mana ement and Administration 6.00% of Contract) <br />-------- --g -- - (- __ <br />$1,964 <br />-- - - - -- - - -------- <br /> - <br />- -- - -- <br />----------------------- <br /> <br />------ -- <br />- -- - <br />- <br />2 773 <br /> <br />-------- <br />-~ ----- -- - I ----- ~ --- -~--- --------- <br />~ ----------------- <br />----r <br />TOTAL BOND AMOUNT <br />-------- <br />--- -----------~--------- <br /> 550,952 <br />jrs <br />Page 1 <br />4/22/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.