Laserfiche WebLink
Mr. Carl Mount <br />RE: Mountain Park Concrete, Inc. Parshall Pit <br />May 1, 2008 <br />Page 2 of 2 <br />of the settling ponds with the clarifier process is a processing change that is not intended to <br />increase or decrease the azea of disturbance. The structure is intended to remain on-site after <br />reclamation is complete. <br />Use of On-Site Product for Reclamation <br />It is the intent of the operator to utilize product from the mining operation for on-site <br />reclamation. The need for import material is not anticipated. <br />If you have any questions regarding this technical revision, please do not hesitate to call me at <br />(303) 452-6611. <br />Sincerely, <br />Applegate Group, Inc. <br />~~..,. <br />__ <br />~~ <br />Ty Thompson <br />Natural Resources Specialist <br />TAT/ta <br />Attachment <br />cc: Joe Docheff, Mountain Park Concrete, Inc. <br />AG File No. 08-118 <br />N:\Og l 1g Parshall Ph TR\Disciplines (Technical)\Mine Planning\TR letter.doc <br />