Laserfiche WebLink
~~ _ _ <br />ADJUSTED COSTS _ _ <br />Ownership Costs <br /> <br />Depreciation CFC Overhead <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $23.62 NA NA NA NA NA NA NA NA NA NA <br />Economic life -Scraper and ROPS : $23.62 NA NA $8.05 $20.94 $12.07 $21.30 NA NA NA NA <br />-Attachment no. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Annual usage : $40.88 $21.73 $18.06 NA NA NA NA NA NA NA NA <br />Double shifts : $30.66 $10.86 $9.02 NA NA NA NA NA NA NA NA <br />Triple shifts : $27.27 $7.23 $6.01 NA NA NA NA NA NA NA NA <br />Mechanic labor -Scraper and ROPS : NA NA NA $6.28 NA $9.41 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Fuel/tube -Scraper and ROPS : NA NA NA NA NA NA NA $46.00 $9.86 $6.45 $1.64 <br />-Attachment no. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC ~ <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Scraper, ROPS and Attachment no. 2 : Scraper and ROPS <br />Single shifts : $40.88 $21.73 $18.06 $6.28 $20.94 $9.41 $21.30 $46.00 $9.86 $6.45 $1.64 <br />Double shifts : $30.66 $10.86 $9.02 Attachment No. 2 <br />Triple shifts : $27.27 $7.23 $6.01 NA NA NA NA NA NA NA NA <br /> <br />HOURLY OPERATOR WAGES <br />Base <br />Fringe - <br />F.I.C.A. - <br />Unempl. -- <br />Wk.Comp. - <br />Total - <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 1 <br />Scraper operator (<40cy) $20.82 $7.22 $1.59 $1.29 $2.04 $32.96 Day : $0.00 Two shift per day average : $0.15 <br />Scraper operator (40+cy) $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />CosUhr ($) <br />Single shifts : $80.67 $121.88 NA $32.96 $235.51 <br />Double shifts : $50.55 $121.88 NA $33.11 $205.55 <br />Triple shifts : $40.52 $121.88 NA $33.21 $195.61 <br />EQUIPMENT PERFORMANCE DATA <br />Machine description : Cat 633E Series 2 (2001) Type of scraper : Single engine elevating <br /> Struck Heaped Average Minimum <br />Operating weight Operating weight GVW Rated Operating Operating Shipping Operating capacity capacity capacity turning <br />(UST) (MT) (Ibs) payload (UST) length (ft.) width (ft.) width (ft.) height (ft.) (cy) (cy) (cy) circle (ft.) <br />56.34 51.10 194,670 41.00 48.58 13.00 11.92 13.92 23.20 34.00 28.60 43.2 <br />TRAVEL SPEEDS (mph) Top speed Horsepower Fuel <br />Transmission gear : 1st 2nd 3rd 4th 5th 6th 7th loaded (mph) (fhp) type <br />forward : NA NA NA NA NA NA NA <br />reverse : NA NA NA NA NA NA NA 33 490 Diesel <br />