Laserfiche WebLink
_ _ _. <br />FORBS : sheet 2 of 2 <br />SHRUBS AND TREES (seed) <br />'TOTAL SEEDS / SO. FT.: 204.9 `TOTAL POUNDS PLS /ACRE : 36.00 `TOTAL SEED MIX COST /ACRE : $375.12 <br />Seed application -method :Broadcast seeding (DMG contract data] TOTAL SEED APPLICATION COST /ACRE : $217.94 <br />MULCHING and MISCELLANEOUS <br />Materials -item no. 1 <br />-item no. 2 <br />- item no. 3 <br />- item no. 4 <br />DESCRIPTION (data source) UNITS I ACRE UNIT COST /UNIT COST /ACRE <br />Straw, delivered {DMG survey data) 2.00 ton $102.28 $204.56 <br />Herbicide -Curtail @ 4.0 pdac 1.00 acre $31.31 $31.31 <br /> <br /> <br />TOTAL MULCH MATERIALS COST I ACRE : $235.87 <br />Application -method no. 1 : Power mulcher (MEANS 32 91 13.16 0700) $65.78 <br />-method no. 2 : Weed spray, truck, non-aquatic area, nox. (DMG] $52.13 <br />-method no. 3 <br />TOTAL MULCH APPLICATION COST /ACRE : $117.91 <br />_ _ _... __ <br />NURSERY STOCK PLANTING TYPE and SIZE <br />COMMON NAME NO. /ACRE (planting cost data source) MATERIAL <br />COST /PLANT PLANTING <br />COST /PLANT COST / FERT. <br />PELLET TOTAL <br />COST /PLANT TOTAL <br />COST /ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST /ACRE : $0.00 <br />JOB COST No. of acres : 2.75 Cost /acre : $1,123.39 INITIAL Job COST : $3,089.32 <br />Estimated failure rate (percent) : 40.00% Cost /acre": $1,123.39 RESEEDING JOB COST : $1,235.73 <br />'Selected replanting work items : F T S M TOTAL JOB COST : $4,325 <br />