Laserfiche WebLink
,; ,: ;> <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $45.74 1 $45.74 $45.74 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $45.74 $45.74 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Eagle <br />Transportation Cycle Time : Non- Total one-way travel distance : 6.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.17 0.17 Total non-roadable mob/demob cost" : $1,555.24 <br />Return time (hours) = 0.17 0.17 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ~" ~ $15.68 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.34 0.34 <br /> <br />JOB TIME AND COST Total job time : 2.69 hours <br /> Total job cost : $1,571 <br />