My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-24_REVISION - M1998024
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998024
>
2008-04-24_REVISION - M1998024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:17 AM
Creation date
5/1/2008 3:58:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
REVISION
Doc Date
4/24/2008
Doc Name
Reclamation cost updates
From
DRMS
To
B&B Excavating, Inc
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />_...... <br />_...._._ <br />___...._ <br />_.... <br />_.._ <br />_:. <br />PROJECT IDENTIFICATION <br />Task # : 01a State :Colorado Permit/job# : M-1998-024 <br />Date <br />User <br />04/23/2008 <br />THM <br />County :Eagle Abbreviation :none <br />Site :Hidden Valley Pit Filename : M024-01a <br />Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Reduce highwalls fo 3H:1V slopes <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cosUhour : $3.35 50 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $170.39 Total fl eet cost/hour : $170.39 <br />MATERIAL QUANTITIES <br />f nitial Swef I Loose <br />volume : 28,890 LCY factor : NA volume : 28,890 LCY <br /> <br />Source of estimated volume :Volumes from original estimate <br />Source of estimated swell factor : NA <br /> <br />,.. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 60 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,246.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.36 (Cat HL3) <br />Average push gradient : 16.50 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,350 feet Material weight : 0.79 (Cat HB) <br />- - - -- - - - - . -Blade type : 1.00 (SfSU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.48 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 602.08 LCY/hr <br />Adjusted fleet production : 602.08 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 47.98 Hours <br />Unit cost : $0.283 /LCY Total job cost : $8,176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.