Laserfiche WebLink
SHRUBS AND TREES (seed) <br />MULCHING and MISCELLANEOUS <br />Materials -item no. 1 <br />- item no. 2 <br />- item no. 3 <br />- item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT COST /UNIT COST /ACRE <br />Hay, delivered {DMG survey data} 2.00 ton $190.55 $381.10 <br />Herbicide - 2,4D @ 1 Ib/ac. 1.00 acre $7.83 $7.83 <br /> <br /> <br />Application -method no. 1 : Crimping, with tractor fDMr, survey <br />- method no. 2 : Weed <br />-method no. 3 <br />TOTAL MULCH MATERIALS GOS I / AGKt <br />truck, non-aquatic area, nox. <br />x366. YJ <br />$57.07 <br />$52.13 <br />TOTAL MULCH APPLICATION COST 1 ACRE : $109.20 <br />_. _ _. <br />_ _. <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. /ACRE (planting cost data source) COST /PLANT COST /PLANT PELLET COST /PLANT COST /ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOIAL NUKSEKT S I UGR cus I / AI.Ke : .yv.vv <br />JOB COST No. of acres : 3.67 Cost I acre : $900.17 INITIAL doh COST : $3,303.62 <br />Estimated failure rate (percent) : 40.00% Cost /acre*: $900.17 RESEEDING JOB COST : $1,321.45 <br />"Selected replanting work items : F T S M TOTAL JOB COST : $4, 625 <br />_. _ <br />,.. _ <br />,..,,. :. <br />FORBS : sheet 2 of 2 <br />"TOTAL SEEDS / SO. FT.: 44.8 "TOTAL POUNDS PLS /ACRE : 9.12 "TOTAL SEED MIX COST /ACRE : $ZUI.57 <br />Seed application -method :Drill seeding {DMG survey data} TOTAL SEED APPLICATION COST /ACRE : $76.78 <br />