Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, <br />Permit or other job action :Technical Revision 49 <br />Task description : Regrade Light-Use Roads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization, <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cosUhour : $103.27 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />,. <br />MATERIAL QUANTITIES ;. <br />Initial Swell Loose <br />volume : 3,200 BCY factor : 1.250 volume : 4,000 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />;,. <br /> <br /> <br />HOURLY PRODUCTION <br /> <br />;. <br />,<:.. <br />Job Condition Correction Factors <br /> <br /> <br />ource <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat Ht3) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted frll or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 ~ (Cat HB) <br />Average push gradient : 5.00 ~ (pos) _ <br />Altitude : 0.95 (Cat HB) <br />Average site attitude : 8,100 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.31 <br />Weight description <br />Decomposed rock - 50% Rock, 50~ Earth Adjusted unit production : 277.72 LCY/hr <br /> Adjusted fleet production : 277.72 LCY/hr <br />.. <br />JOB TIME AND COST ;.. ; <br />Fleet size : 1 Dozers} Total job time : 14.40 Hours <br />Unit cost : $0.747 /LCY Total job cost : $2,989 <br /> <br />And Safety <br />