Laserfiche WebLink
• <br />CONTENTS <br /> <br />1.0 <br />INTRODUCTION Page <br />1 <br /> 1.1 Mine Life Extension activities summary 2 <br />2.0 SITE DESCRIPTION 5 <br /> 2.1 Site location and topography 5 <br /> 2.3 Geological summary 8 <br />3.0 MAIN PROJECT AREA HYDROLOGIC CONDITIONS g <br /> 3.1 Main project area general hydrology g <br /> 3.2 Main project area general hydrogeology g <br /> 3.3 Hydrologic monitoring program 10 <br /> 3.4 Cripple Creek ~ 10 <br /> 3.5 Arequa Gulch 12 <br /> 3.8 Squaw Gulch <br />3.9 Vindicator Valley 16 <br /> 17 <br /> 3.10 Gold Run 18 <br />4.0 GRASSY VALLEY HYDROLOGIC CONDITIONS 21 <br /> 4.1 Grassy Valley description and background 21 <br /> 4.2 2007 Field investigation activities 22 <br /> 4.2.1 Investigation scope and objectives 22 <br /> 4.2.2 Drilling and monitoring well and piezometer installation 22 <br /> 4.3 Grassy Valley hydrologic and hydrogeologic conditions 23 <br /> 4.4 Grassy Valley water balance modeling 28 <br /> 4.4.1 Objectives 29 <br /> 4.4.2 Conceptual model -current conditions 29 <br /> 4.4.3 Conceptual model -mining conditions 29 <br /> 4.4.4 Conceptual model -post-mining conditions 30 <br /> 4.4.5 Input data 31 <br /> 4.4.5 Calculations 34 <br /> 4.4.6 Calibration to current conditions 36 <br /> 4.4.7 Predictions for mining conditions 37 <br /> 4.4.8 Predictions for post-mining conditions S7 <br /> 4.4.9 Sensitivity Analysis 38 <br /> 4.4.10 Water balance summary and conclusions 41 <br /> 4.5 ECOSA design recommendations 42 <br />5.0 SUMMARY AND CONCLUSIONS 45 <br /> 5.1 Main project area 45 <br /> 5.2 Grassy Valley area 46 <br />REFERENCES 51 <br />2736 <br />Cripple Creek & Victor Mining Company <br />Water Management Consultants <br />