My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-23_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2008-04-23_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:26 PM
Creation date
4/28/2008 10:32:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
4/23/2008
Doc Name
E-mail Correspondence Regarding Public Comment Period
From
DRMS
To
S Pautsky
Type & Sequence
SL3
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ~ ~ ~ ~ ~ ~~ Page 1 of 2 <br />s~ -3 <br />ou-t' ca /~cs~.ri~Q <br />Kaldenbach, Tom -- / <br />From: Kaldenbach, Tom ec~v~~ S va N fs ~ y <br />Sent: Wednesday, April 23, 2008 9:21 AM <br />To: PAUTSKY@aol.com <br />Subject: RE: Carbon Junction Mine Phase I bond release <br />Attachments: release amount.pdf <br />Sandra, <br />The bond release (No. SL-3) will become final on May 23, 2008 when the public comment period expires, and <br />assuming no objections are received. Upon becoming final, the required warranty will be $403,201, calculated as <br />follows. <br />Pre-existing bond liability, as previously determined in Technical Revision 13 <br />Add $22,674 for an error in task hours found in the reclamation cost estimate during <br />review of bond application SL-3 <br />Total corrected bond liability before approval of SL-03 <br />Minus SL-03 release amount (60% of applicable <br />amount of $501,032 from attached spreadsheet) <br />Post SL-3 liability <br />$695,436 <br />22 674 <br />$718,110 <br />314 909 <br />$403,201 <br />The amount of required warranty will change again in a few weeks when I update the reclamation cost estimate <br />for permit renewal RN-3 which is in review. I do not know how much it will change, but I would guess it could go <br />up or down by approximately $50,000. <br />The error in task hours noted above was found in a spreadsheet during the review of the bond release <br />application. I notified Mike Savage of the error in an email dated April 4, 2008. As a result of that error, you had <br />previously been required to have on deposit $22,674 less bond than you should have. I can email you the <br />spreadsheet showing the error, if you would like. You may request an informal conference with DRMS regarding <br />the $22,674 correction. <br />The letter JPMorganChase received from DRMS must have been regarding the previous bond release reduction <br />which occurred in the last two years, as the current bond release (SL-03) approval has not yet become final. It <br />becomes final on May 23, 2008, as explained above. <br />You will receive the Findings document for bond release SL-3 in the mail in the next few days. <br />If you have further questions, feel free to call me at (303) 866-4923 or email me. <br />Tom <br />From: PAUTSKY@aol.com [mailto:PAUTSKY@aol.com] <br />Sent: Tue 4/22/2008 2:40 PM <br />4/24/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.