Laserfiche WebLink
• <br />EXPECTED OFF-SITE IMPACTS ......................................................................15 <br />ATTACHMENT A, CALCULATION METHODS ................................................17 <br />ATTACHMENT B -SEDCAD RESULTS OF ROUTING ................................... 20 <br />ATTACHMENT C -SEDCAD POND GEOMETRY ........................................... 21 <br />TABLES <br />Table I Summary of Runoff Volume, Design Volume, and Approximate Dimensions of <br />EMP ponds ......................................................................................................................11 <br />FIGURES <br />• <br />• <br />Figure 1 -East Cresson Storm Water Management Schematic, During Operations ........7 <br />Figure 2 -Storm Water Management for West Side of Mine, During Operations .............7 <br />Figure 3 -East Cresson and Wildhorse Storm Water Mangement after Closure ..............9 <br />Figure 4 -Storm Water Management after Closure, West Side North of Squaw Gulch....9 <br />Figure 5 -Residence Time and Settling Efficiency of EMPs ...........................................14 <br />Figure 6 Riprap Size as Function of Slope and Shields Shear Stress ............................19 <br />ATTACHMENT B INCLUDES THE FOLLOWING INFORMATION <br />Structure Network, Sub-watershed Details, and Sub-watershed Tc for East Cresson OSA <br />Structure Network and Sub-watershed Hydrology for North Cresson and Poverty Gulch <br />Structure Network and Sub-watershed Hydrology for Squaw Gulch OSA <br />