My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (274)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (274)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
4/24/2008 3:20:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
County Vol 1 Attachment 10
From
CC &V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrology Results <br />Table I is a summary of the SEDCAD results that correspond to the diagrams. <br />That table lists the following information: <br />• The basin properties and curve numbers <br />• The calculated precipitation excess using the SCS Curve Number method <br />• ~ Runoff volume (10 year/24-hour storm) and design volume for the EMPs (twice that <br />volume). <br />• Approximate footprint dimensions of the pond base and crest based on a_ depth of 15 <br />feet and 2:1 slopes. The ponds may be fully incised or incised to a depth of 5 feet <br />while maintaining anon-jurisdictional status with the Office of the State Engineer. <br />• The calculation methodology that was used to prepare Table I is described in <br />Attachment A. <br />• <br />Several basins may report to specific structures, such as EMP015. The table lists <br />both the individual sub-watershed requirements and the requirements for the entire basin that <br />is tributary to each EMP. <br />Client:CC&V Gold Mining Co. 4/11/08 <br />Title: Storm Water Management, MLE Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.