Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company MLE Traffic Impact Study <br />(future background traffic plus mine-related traffic at the maximum potential operational <br />level) at the two mine access intersections will operate at levels of service that are not <br />significantly lower than the current traffic operational levels of service. <br />In general, changes in traffic volumes and patterns due to the MLE project will not <br />significantly affect traffic operations on the key roadways and intersections around the <br />mine. With the proposed realignment of CR 82 and the proposed auxiliary lane <br />improvements at the CR 821/SH 67 intersection, the impacts of the MLE project will be <br />minimized. Traffic will continue to operate similar to current conditions with ample <br />capacity and increased safety. <br />• <br />• <br />Interstate Engineering, Inc. 15 April, 2008 <br />