Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 04a State :Colorado Permit/job # : M-1990-094 <br />Date : 04/21/2008 County :Mesa Abbreviation :none <br />User : THM Site :Orchard Grove Industrial Pit Filename : M094-04a <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Haul soil to spread on ins/opes and around pond margins <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck :Generic 8-10 cy, 6x4 <br />-Loader :CAT 938G (2003) <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />Utilization-machine : 100 91 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $9.32 $16.13 NA NA NA NA <br />Operating cost/hour : $35.05 $23.84 NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Operator cost/hour : $24.14 $32.78 NA NA NA NA <br />Unit subtotals : $68.52 $72.74 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $209.77 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $209.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2.778 CC Y factor : 1.125 volume : 3,125 LCY <br />Source of quantity takeoff :Reclamation Plan <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.: Earth -Dry packed Heaped volume <br />Rated payload <br />Payload capacity <br />27,280 pounds Average volume <br />10.70 LCY Adjusted volume": <br />Final truck volume based on number of loader passes <br />'truck wlume adjusted to nol exceed rated payload or heaped wlume <br />8.00 LCY <br />10.00 LCY <br />9.00 LCY <br />10.00 LCY <br />7.15 LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) <br />Rated capacity (nom. heaped) : 3.250 LCY Truck Loader <br />Descr.: Other -rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity : 3.575 LCY Net correction : 0.830 0.830 <br /> <br />4, 530 <br />Source <br />