My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-21_REVISION - M1990094
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990094
>
2008-04-21_REVISION - M1990094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:23 AM
Creation date
4/24/2008 8:01:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990094
IBM Index Class Name
REVISION
Doc Date
4/21/2008
Doc Name
Reclamation cost update
From
DRMS
To
Parkerson Construction, Inc
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nnnnnQr ~ ~n~ uonnGr~~r sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $45.76 1 $45.76 $45.76 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $45.76 $45.76 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.17 0.17 Total non-roadable mob/demob cost " : $283.12 <br />Return time (hours) = 0.17 0.17 * iwo round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "" : $15.25 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.33 0.33 <br /> <br />JOB TIME AND COST Total job time : 2.67 hours <br /> Total job cost : $298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.