My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-18_REVISION - M2001060
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001060
>
2008-04-18_REVISION - M2001060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:12 PM
Creation date
4/24/2008 8:01:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001060
IBM Index Class Name
REVISION
Doc Date
4/18/2008
Doc Name
Reclamation costs update & notice of surety increase
From
DRMS
To
3B Enterprises, LLC
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Spread 10"topsoil over 14 acres <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br /> Operating cost/hour : $56.19 100 <br /> Ripper op. cost/hour : $0.54 10 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $137.87 Total fl eet cost/hour : $137.87 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 16,166 LCY factor : NA volume : 16,166 LCY <br />Source of estimated volume :Reclamation Map and Plan <br />Source of estimated swell factor :NA <br />- .. .., <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 714.3 LCY/hr Dozing method : 1.00 _ (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rl) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,180 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.86 <br />Weight description <br />Top Soil Adjusted unit production : 612.74 LCY/hr <br /> Adjusted fleet production : 612.74 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 26.38 Hours <br />Unit cost : $0.225 /LCY Total job cost : $3,637 <br />
The URL can be used to link to this page
Your browser does not support the video tag.