Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $55.22 1 $55.22 $55.22 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $55.22 $55.22 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 0.06 <br />Return time (hours) = 0.06 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Equipment <br />0.06 Total non-roadable mob/demob cost <br />0.06 * two round trips with haul rig <br />NA Total roadable mob/demob cost `~ <br />NA ** one round trip, no haul rig <br />Craig <br />2.0 miles <br />35.0 mph <br />$239.89 <br />$6.31 <br />Subtotals = 1.11 0.11 <br />JOB TIME AND COST Total job time : 2,23 hours <br />Total job cost : $246 <br />