My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (337)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (337)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
4/23/2008 2:41:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL I Project Description pages 1.1-7.1 and 7.4 through 14.2 (end of Volume I)
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• provide a summary of the proposed design and construction, and incorporate design <br />information which has been previously approved by the ML1tB. <br />6.2 Phase 5 VLF and Underdrain System Design Components <br />6.2.1 Underdrain System <br />Although there is no evidence of shallow ground water seepage within the <br />footprint of the Phase 5 VLF, the design includes a similar Underdrain system to <br />the existing approved VLF Underdrain system. After the Phase 5 VLF area has <br />been cleared and the foundation prepared to grade, an Underdrain system will be <br />installed beneath the Phase 5 VLF area to intercept potential shallow ground <br />water seepage that may arise at times and carry the flows beneath and away from <br />the VLF. The Underdrain system consists of primary, secondary and tertiary <br />underdrains. The primary underdrains will collect and convey flows from the <br />secondary underdrains. Secondary underdrains will be installed in topographic <br />lows beneath the Phase 5 VLF area. Tertiary underdrains will be installed during <br />construction if seepage is observed outside of the topographic lows. The <br />underdrains will route flow into a collection pipe located at the upstream toe of <br />the PSSA embankment and designed to return any potential water collected by the <br />• system into the Phase IV VLF containment. <br />As part of the Phase 5, design the effects of increased depth of ore on the flow <br />capacity of the existing VLF underdrains was evaluated (see Appendix 8, <br />Volumes V and VI). The evaluation determined that the existing underdrains have <br />sufficient capacity and integrity under the increased depth to ensure continued <br />operation. <br />6.2.2 Ore Storage Area Liner System <br />The ore storage area will be constructed with the composite liner system as <br />previously approved for the Phase IV construction. This system consists of a <br />minimum one-foot thick soil liner fill ("SLF") with a maximum permeability of <br />1x10-6 centimeters/second ("cm/sec") placed on a prepared surface and overlain <br />by an 80-mil single-sided textured (texture side down) linear low density <br />polyethylene ("LLDPE") geomembrane. The geomembrane will be overlain by a <br />pipe drain system and a minimum of two feet of drain cover fill ("DCF") prior to <br />placement of the ore. The pipe drain system, called the high volume solution <br />collection system ("HVSCS"), consists of a network of pipes laid in a dendritic <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />6-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.