Laserfiche WebLink
EXI IIBIT D, Ray Glover Pit # 17 <br />Reclamation Plan <br />e) Waste rock piles will be hauled for use in the county ditches, etc. where <br />for fill material. This <br />operation will use berms to minimize hydrologic balance and provide fo$~ a stable configuration <br />consistent with the proposed future landuse <br />