Laserfiche WebLink
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />040 -Replace Topsoil from Stockpile 'A" to Pond 010 scraped 4 21.21 $29,993 <br />041 -Replace Topsoil from Stockpile "8" to Shop Area scraped 4 16.2 $22, 934 <br />042 -Replace Topsoil from Stockpile "C" to Haul Road 'B" scraped 4 20.3 $28, 777 <br />043 -Replace Topsoil from Stockpile "H" to Wadge Pit scraper1 4 57.41 $81,185 <br />044 -Replace Topsoil from Stockpile "1" to Wadge Pit scraper1 4 58.0 $82,092 <br />045 -Replace Topsoil from Stockpile 'K" to Wadge Pit scraped 4 77.2 $109,264 <br />046 -Replace Topsoil from Stockpile "L" to Wadge Pit scraped 4 81.2 $114,950 <br />047 -Replace Topsoil from Stockpile "M" to Wadge Pit scraper1 4 120.0 $169,800 <br />048 -Replace Topsoil from Stockpile "O" to Wadge Pit scraper1 4 128.2 $181,300 <br />049 -Replace Topsoil from Stockpile 'P" to Wadge Pit scraper1 4 99.2 $140,377 <br />050 -Replace Topsoil from Stockpile "Q" to Wadge Pit scraper1 4 137.4 $194,412 <br />051 -Replace Topsoil from Stockpile "R" to Wadge Pit scraper1 4 150.6 $213,018 <br />052 -Replace Topsoil from Stockpile to Drill Pads (from Minor Revision 17) dozer 2 0.7 $669 <br />053 -Replace Topsoil from Stockpile to Access Road to Drill Pad #2 (from MR dozer 2 0.2 $254 <br />054 -Replace Topsoil from Stockpile to Temporary Access Road to Pond 010 dozer 2 0.2 $251 <br />055 -Replace Topsoil from Stockpile 'M" to Additional Disturbance from TR-21 scraped 4 14.31 $19,939 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 983.0 $1,389,215 <br />