My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-04_REVISION - C1994082 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2008-04-04_REVISION - C1994082 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:03 PM
Creation date
4/7/2008 11:24:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
4/4/2008
Doc Name
Cost Estimate
From
Jim Stark
To
Dan Mathews
Type & Sequence
MT3
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />INTEROFFICE <br />MEMORANDUM <br />TO: Dan Mathews <br />FROM: Jim Stark <br />SUBJECT: Yoast 2008 MTR Estimate <br />DATE: 4 Apri12008 <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />-&- <br />SAF ETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Attached is the reclamation cost estimate for the Yoast Mine's 2008 Midterm Review. <br />The estimate is 88 Tasks and represents a new liability of $5,472,521.00. This estimate is <br />an increase in liability of $376,832.00 over Yoast's current liability (of $5,096,689.00) <br />and an increase in liability of $272,521.00 over the current bond held of $5,200,000.00. <br />The main reason for the increase in liability is an increase in equipment costs. The most <br />substantial cost increase was for the CAT D 11 R dozer. The hourly cost increased from <br />$331.16 in 2005 to $432.96 today (an increase of $101.80 or almost 31 %). The table <br />below details the increases in cost for the major equipment on site as well as the main <br />areas where the costs increased. Of note on the Drainage Control tasks is that <br />$139,930.00 of the overall increase in cost for that task group (a total increase of <br />$157,754.00) was for the construction of the post-mining drainage channels. <br />Descri tion RN-02 Cost 2008 MTR Cost Difference <br /> <br />Hourly Dozer Cost- <br />D 11 R <br />$331.16 <br />$432.96 <br />$101.80 <br />Hourly Scraper Cost- <br />637E <br />$275.07 <br />$313.18 <br />$38.11 <br />Hourly Grader Cost- <br />14H <br />$109.28 <br />$116.18 <br />$6.90 <br /> <br />Blastin and Gradin $549,897.00 $690,065.00 $140,168.00 <br />Ri in $25,625.00 $44,548.00 $18,923.00 <br />Road Reclamation $42,847.00 $52,347.00 $9,500.00 <br />Finish Gradin $8,573.00 $9,114.00 $541.00 <br />Drainage Control $525,441.00 $683,195.00 $157,754.00 <br />To soil Re lacement $1,301,658.00 $1,389,215.00 $87,557.00 <br />Miscellaneous Tasks $396,243.00 $461,867.00 $65,624.00 <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.