Laserfiche WebLink
EXHIBIT E <br />RECLAMATION PLAN (CONY) <br />revegetation until it is released. The operator estimates that <br />this will happen 3 to 5 years after mining is completed. <br />If revegetation problems occur before release, an analysis <br />of the site will be made and the area will be revegetated again <br />as necessary. The seed mixture and rates may be revised as <br />needed to complete reclamation, if a modification is required, <br />the Division will be notified in the next annual report after the <br />change was made. This gives us the most flexibility to complete <br />reclamation successfully. <br />This Timetable reflects the areas shown on the Reclamation <br />Plan map on the map plat supplied with this amendment. <br />ACRES +_ <br />PHASE YEARS TOTAL CONIMERCIAL <br />AREA REVEGETATION SETBACKS/ <br />UNDISTURBED <br />EXISTING AREA 4-6 21.31 17.21 2.85 1.34 <br />NEW AREA 4-6 11.60 7.09 2.64 1.87 <br />TOTALS 32.91 24.30 5.49 3.21 <br />10 <br />