Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />__ _ <br />PROJECT IDENTIFICATION, sheet 1 of 2 <br />Agency or organization name :DRMS <br />Task # : 16a State :Colorado Permit/job # : M-1979-089 <br />Date :03/19/2008 County :Mesa Abbreviation :none <br />User : THM Site :23 Road Pit Filename :M089-16a <br />Permit or otherjob action :Final Reclamation Cost Update <br />Task description :Initial mobilization to and from site <br />EQUIPMENT TRANSPORT F21G COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $0.00 <br />-CAT966G (2002) 25.10 $29.49 $117.55 1 $147.04 $117.55 $0.00 <br />-Cat 633E Series 2 (2001) 56.34 $80.67 $125.45 1 $206.12 $125.45 $0.00 <br />-CAT PS-2008 (2004) 5.46 $15.19 $88.67 1 $103.86 $88.67 $0.00 <br />-Centrifugal pump - 200M, 1 2.03 $39.60 $88.67 3 $384.81 $266.01 $0.00 <br />-Revegetation Tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,138.30 $811.80 $0.00 <br />