Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />_.._. <br />_.._. <br />_.... <br />_._ <br /> <br /> <br />_ <br /> <br />_ ... <br />_. <br />PROJECT IDENTIFICATION <br />Task # : 06a State :Colorado Permitfjob # : M-1979-089 <br />Date : 03/19/2008 County :Mesa Abbreviation :none <br />User : THM Site :23 Road Pit Filename : M089-O6a <br /> <br />Agency or organization name : DRMS __ <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Topsoil spreading around Phase 1 pond in AM-02 <br />HOURLY EQUIPMENT COST Basic machine :CAT 966G (2002) Horsepower : 235 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br /> <br />Utilization __ <br />Cost Breakdown : Ownership cosUhour : $29.49 NA <br />Operating cost/hour : $40.39 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $102.66 Total fleet cosUhour : $102.66 <br />MATERIAL QIIANTITIES <br />Initial Swell Final <br />volume : 1,479 LCY factor : NA volume : 1,479 LCY <br />Source of quantity take-off : AM-02 bond calculation <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cvcle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.575 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat Hl3) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br />Net cycle nme aalusrmem : -v.vw mmuces <br />Adjusted basic cycle time : 0.555 minutes <br />Rolling Resistance -Road Conditions <br />Haul :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Return :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 450 0.00 5.00 5.00 0.4240 (Cat HB) <br />Return route : 450 0.00 5.00 5.00 0.3853 (Cat HB) <br /> i oral travel nme : u.rsuaa mmuces <br />Loader Bucket Caoacitv Total cycle time : 1.364 minutes <br />Rated capacity : 4.75 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity : 5.23 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat Hl3) <br />Site altitude : 4,532 feet Job efficiency factor : 0.83 (1 shiff/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 229.79 LCY/Hr <br />,4djusted hourly unit production : 190.72 LCY/Hr (Cat HB) <br />F~djusted hourly Fleet production : 190.72 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 7.75 Hours <br />Unit cost : $0.538 /LCY Total job cost : $796 <br />