My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-27_REVISION - M2005050
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005050
>
2008-03-27_REVISION - M2005050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:16 PM
Creation date
4/1/2008 8:51:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005050
IBM Index Class Name
REVISION
Doc Date
3/27/2008
Doc Name
TR-01 Review
From
DRMS
To
Bluerock Energy Corporation
Type & Sequence
TR1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLO[ZADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />~~~~I~~~ <br />~~~ <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />- &- <br />SAF ETY <br />March 27, 2008 <br />MAC 3 1 2008 <br />Division or Reclamation, <br />Mining and Safety <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Tim Pierce ~ Ronald W. Cattany <br />Division Director <br />Blue Rock Energy Corporation Natural Resource Trustee <br />P.O. Box 459 <br />Nucla, Colorado 81424 / <br />Re: J-Birds Mi ,Permit No. M-2005-OSO, Technical Revision, Stormwater Management Plan, TR- <br />01, Review <br />Dear Mr. Pierce, <br />The Division of Reclamation Mining and Safety has reviewed the Stormwater Management Plan for the <br />above referenced site. The plan was reviewed by the Division's engineer Allen Sorenson and he has <br />responded back to staff. Please find attached Mr. Sorenson's memo. Four issues noted by Mr. Sorenson <br />must be addressed by Blue Rock to ensure the plan meets the Division's requirements for the site. <br />Please respond to these issues as soon as possible. <br />Based on the fact that Blue Rock Energy must respond to the engineering review the Decision Date of <br />March 27, 2008 for the TR cannot be met. Please submit an extension request by fax to this office by <br />the end of the working day. In making the request, please allow sufficient time for Blue Rock and the <br />Division to submit and review any new materials. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and <br />Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, <br />telephone no. 970.241.1117. <br />Sincerely, <br />~~ <br />G. Russell Means <br />Environmental Protection Specialist II <br />Cc: Allen Sorenson, DRMS Engineer, Denver (e-mail) <br />Cc: Carl Mount, Senior Environmental Protection Specialist, North Team Supervisor, (e-mail) <br />Enclosure: Memo, 3/25/07, Allen Sorenson to Russ Means <br />Office of <br />Office of Active and Inactive Mines <br />Mined Land Reclamation Denver Grand Junction Durango <br />
The URL can be used to link to this page
Your browser does not support the video tag.