My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-28_REVISION - M1980085 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980085
>
2008-03-28_REVISION - M1980085 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:08 PM
Creation date
4/1/2008 8:51:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
REVISION
Doc Date
3/28/2008
Doc Name
Bond reduction is requested
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The backfill creates an advancing highwall within the pit. The new highwall is at a <br />O.SH:1 V currently, and will have to be reclaimed to 3H:1 V: <br />Designed <br />reclamation slope <br />3H:1V Mined slope <br />0.5H:1V <br />The new highwall runs 700 feet across the pit. The reclamation of this highwall will be <br />completed by a dozer pushing the crest of the slope down to create the final 3H:1 V slope. <br />Therefore, warranty reduction for Vagneur Pit is determined based on the cost of <br />reclaiming the old highwall minus the cost to reclaim the new highwall. This is shown in <br />the following table: <br />Table 1 -Warranty Reduction Amount <br /> Unit Cost <br />Activity description Quanity Units ($i~y) Cost ($) <br />Backfilling of slope from 1 H:1 V to 3H:1 V <br />over a distance of 2,100 linear feet to within 3' <br />of the top of the highwall. 380,411 cy 0.68 $258,680 <br />700 feet of O.SH:1 V highwall created across <br />the front of the backfill. Quantity and cost <br />reflect material need to return to 3H:1 V, via <br />dozer. 145,477 cy 0.35 $50,917 <br />Net warranty reduction $207,763 <br />DMG Costs (21% x direct costs) $43,630 <br />Total Bond Reduction Amount $251,393 <br />
The URL can be used to link to this page
Your browser does not support the video tag.