My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-28_REVISION - M1989056 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989056
>
2008-03-28_REVISION - M1989056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:17 AM
Creation date
3/28/2008 3:32:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
REVISION
Doc Date
3/28/2008
Doc Name
Financial warranty increase
From
DRMS
To
Don Kehn Construction Inc.
Type & Sequence
SI1
Email Name
ESC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ownership Costs <br /> Overhaul and Operating Costs sheet 2 of 2 <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts L <br />b <br />Acquisition cost : $18 <br />23 a <br />or Parts Fuel Lube Tires G <br />E <br />C <br /> <br /> <br />Econ.life -Dozer and ROPS <br /> <br />: <br />. <br />$18.23 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br /> <br />NA . <br />. <br />. <br />NA <br /> <br />-Attachment no. 2 <br />: <br />NA <br />NA NA $7.24 $13.57 $8.05 $13.09 NA NA NA NA <br /> <br />Annual usage : <br />$27.50 <br /> <br />$12.34 NA <br /> <br />$1729 $1.21 $1.30 $2.21 <br />$1.31 <br />NA <br />NA <br />NA <br />NA <br /> <br />Double shifts : <br />$20.62 <br />$8.17 <br />$8 <br />84 NA NA NA NA NA NA NA NA <br /> <br /> <br />Triple shifts : <br /> <br />$18.34 <br /> <br />$4.11 . <br /> <br />$5 <br />76 NA NA NA NA NA <br />NA <br />NA <br />NA <br /> <br />Mechanic labor-Dozer and ROPS : <br />NA . NA NA NA NA NA <br />NA <br />NA <br />NA <br /> <br />-Attachment no <br />2 : <br />NA NA NA $5.65 NA $8.28 NA NA NA NA NA <br />. <br />Fue8lube -Dozer and ROPS : <br />NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br /> <br /> <br />Attachment no <br />2 : <br /> <br />NA NA NA NA NA NA NA <br />$30.56 <br />$5.97 <br />$0.00 <br />$2.01 <br />. NA NA NA NA NA <br /> <br />::::::.~::: ::::.:::::::::::::::.::::: <br />:::::::.....::::::::::::.:::: <br />...:.:.:::.::::.::::::.....:.::::::::.. <br />.::::....:.::::::::::::::::: <br />:... <br />..................... NA <br />$0 <br />$0.34 <br /> <br />$0.00 <br /> <br />$1.09 <br />STED COST SUBTOTALS <br />ership Costs ;.. ,.:.. , .;; :.::::::.; : . ,,.:;.,:;..;,;;;...;: <br /> Overhaul and Operating Costs <br /> Overhaul Field Repair <br /> <br />ROPS and Attachment no. 2 : Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br /> Dozer and ROPS <br />Single shifts : <br />Double shifts : $2750 <br /> <br />$20 <br />62 $12.34 $1729 $5.65 $13.57 $8.28 $13.09 $30.56 <br />$5.97 <br />$0.00 <br />$2 <br />01 <br /> . $8.17 $8.64 ttachment no. 2 . <br />Tri I <br />e shi <br />fts <br />P <br /> <br />$18 <br />34 <br />. <br />. <br />$4.11 <br />$5.76 <br />$0.94 <br />$1.30 <br />$1.72 <br />1.31 <br /> <br />0 <br />00 <br /> <br />$0 <br />34 <br /> . . $0.00 1.09 <br />tLY OPERATOR WAGES ase _.... .. ,.... <br />:; ::::..;: >::; :: <br />> <br />»: <br />> <br />:;: . <br /> <br /> <br />Fringe <br /> <br />F.I.C.A. <br /> <br />Unempl. <br /> <br />Wk.Comp. <br /> <br />Total <br />. . : <br />: <br />: <br />:;; .: <br />:::..: :.:.:::.. <br /> <br />Dozer operator (< 70hp Rate <br />$20.67 Benefits <br />$7 <br />22 765% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : i <br /> <br />Dozer operator (>=70hp <br />$20.67 . <br /> <br />$722 $1.58 $1.28 $2.03 $32.78 <br />Day : <br />$0.00 <br />Two shift per day average : <br />$0.15 <br /> <br />Mechani <br />$20.97 <br />$7 <br />22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift <br />per day average : <br />$0.25 <br /> <br />::..:.::.::.....~::::...:.. <br />>:_>s:t»>::x:>: s:»:»:>:>.<:>::;<.>::>:>:>:<;:,:<::;;.:; <br />..:.:: <br />:;:.:;: <br />::.:..:..............:.::.::..:. <br />;:;.::•;:;:;:.:::::::;::::::::::: <br />~.::. <br />, .... . <br />.::.....::::. ,:.:.:...... <br />...:...:. $1.60 $1.30 $2.06 $33.15 Ni <br />ht. <br /> <br />$0.45 <br />H <br />OURLY <br />E UIPM <br />Q ENT <br />COST SUM <br />MARY <br /> <br /> <br /> <br /> <br />wnership <br /> <br /> <br /> <br /> <br />perating and Overhaul <br />Machine Attachments <br />Sin91e <br />shifts : <br />- $77.13- $~T <br />Double shifts : $35.44 $7713 $6.71 <br />Triple shifts : $28.21 $7713 $6.71 <br />PERFORMANCE DATA Horsepower Transmission Weight <br /> Description (FHP) Type (UST) <br />Dozer : Cat D8R Series Il - 8SU (2 310 NA 41 8 <br />Blade : Semi-Universal NA NA 5.4 <br />Attachment no. 1 : ROPS Cab NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 5.4 <br /> <br />>` __ ...:: _..._.. _ Total weight: 52.5 <br />Operator Total <br />CosUhr ($ <br />$32.78 <br />$32.93 <br />$33.03 <br />$173.74 <br />$152.20 <br />$145.07 <br />Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />22.7 8.7 11.5 diesel N <br /> A <br />NA 12.9 5.5 NA NA <br />NA NA NA NA NA <br />3.6 71 2 <br />6 NA <br /> <br />.~ ~~,-. . Adj. Parallelogram <br />
The URL can be used to link to this page
Your browser does not support the video tag.