Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />Total <br />Cost/hour/unit <br />Fleet Size <br />(No. units) <br /> <br />C <br />Maul Trip <br />bst/hr/fleet sheet 2 of 2 <br />Retum Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T. $48.12 1 $48.12 $48.12 <br />-Fuel Tanker, 4x2, 170 HP $56.27 1 $56.27 $56.27 <br />-Cube Truck, 4x2, 170 HP $64.17 1 $64.17 $64.17 <br />Subtotals :~ ~t168.56 I x168.56 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project a ea region : Fort Collins <br />Transportation Cycle Time : Non- Total one-way trave distance : 10.0 miles <br /> Roadable Roadable Average tra el speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.22 0.22 Total non-roadable mob/de ob cost * : $9,207.08 <br />Return time (hours) = 0.22 0.22 I <br />'two round trips 4vith haul rig <br />Loading time (hours) = 2.00 NA I <br />Total roadable mob/dem ob cost ** • $74.92 <br />Unloading time (hours) = 2.00 NA '• one round trip , no haul rig <br />Subtotals = 4.44 0.44 <br />JOB TIME AND COST Tota'I job time : 8.89 hours <br />Tot~l job cost : X9,282 <br />