(6) Any drill or auger holes that are part of the mining operation shall be plugged in <br />accordance with methods approved by the Division: No adits or shafts will be employed in <br />this operation. All drilled or auger holes will occur within the limits of the slurry wall or area <br />excavated by the mining operation, therefore ground water resources will not be impacted. <br />However, if any drill, backhoe pits or auger holes are required outside the confines of the slurry <br />walls or zoned perimeter dam, they will be constructed by trained crews and shall be backfilled <br />as soon as practicable. <br />(7) Maximum slopes and slope combination shalt be compatible with the configuration of the <br />surrounding conditions and the selected post mining land use: The proposed post mining <br />land use will be developed water resource. This Pueblo County approved post mining land use <br />is a change from the existing land use, agricultural land The final interior pit slopes will not be <br />steeper than 3H: IV The constructed dams that will surround the excavated areas will be <br />according to site-specific designs for earthen dams approved by the SEO. <br />(8) Not applicable <br />(9) Placement of inert structural fill imported from off-site: At this time the Operator does not <br />intend to import inert structural fill from off-site since on-site construction materials appear <br />suitable for developed water resource facilities construction. If material is imported, in order to <br />facilitate developed water resource facilities construction, the Operator will comply with the <br />provision of Section 3.1.5(9) of the Division's and Mined Land Reclamation Board's <br />regulation. <br />(10) All mined material to be disposed of within the affected area must be handled in such a <br />manner so as to prevent any unauthorized release of pollutants to the surface drainage <br />system: All mined material will be handled in such a manner so as to prevent any <br />unauthorized release of pollutants to the surface drainage system. All stockpiled material will <br />be located and managed so as to avoid any uncontrolled runoff. All storm water runoff from the <br />site will be in accordance with the Operator/Applicant's Stormwater Management Plan. The <br />Operator/Applicant intends to operate the site such that storm water will either be prevented <br />from contacting the above listed items; or where it does come into contact with any of the above <br />listed items, it will not be discharged from the site. Regardless, a Stormwater Discharge Permit <br />will be obtained from the Water Quality Control Division, Department of Public Health and <br />Environment, State of Colorado. In addition, the Stromwater Management Plan will be in place <br />for the operation. <br />Stonewall Springs Quarry Pit commits to placing overburden stockpiles along the lo