Laserfiche WebLink
RAOn4R1 F FCJIIIPMENT Sheet 2 Of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $51.70 1 $51.70 $51.70 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $51.70 $51.70 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 50.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.30 0.30 Total non-roadable mob/demob cost " : $868.00 <br />Return time (hours) = 0.30 0.30 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost'" : $31.02 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.60 0.60 <br />JOB TIME AND COST Total job time : 3.20 hours <br /> Total job cost : $899 <br />