My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-18_REVISION - M1978357
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978357
>
2008-03-18_REVISION - M1978357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:17 AM
Creation date
3/25/2008 3:38:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978357
IBM Index Class Name
REVISION
Doc Date
3/18/2008
Doc Name
Cost update & notice of surety increase
From
DRMS
To
Grand Junction Pipe and Sand
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_-- <br />ADJUSTED COSTS <br />Ownership Costs <br /> <br />Depreciation CFC Overhead <br />Overhaul and Operating Costs see o <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : <br />life -Dozer and ROPS : <br />Econ $18.23 <br />$18.23 NA <br />NA NA <br />NA NA <br />$7.24 NA <br />$13.57 NA <br />$8.05 NA <br />$13.09 NA <br />NA NA <br />NA NA <br />NA NA <br />NA <br />. <br />-Attachment no. 2 : NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.50 $12.34 $17.29 NA NA NA NA NA NA NA NA <br />Double shifts : $20.62 $6.17 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : <br />Mechanic labor-Dozer and ROPS : $18.34 <br />NA $4.11 <br />NA $5.76 <br />NA NA <br />$5.65 NA <br />NA NA <br />$6.28 NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA <br />-Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/tube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $5.97 $0.00 $2.01 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br /> <br />ADJUSTED COST SUBTOTALS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2 : <br />Single shifts : <br />$27.50 $12.34 $17.29 Dozer and ROPS <br />$5.65 $13.57 $6.28 $13.09 $30.56 $5.97 $0.00 $2.01 <br />Double shifts : $20.62 $6.17 $8.64 ttachment no. 2 <br />Triple shifts : $18.34 $4.11 $5.76 $0.94 $1.30 $1.72 $1.31 $0.00 $0.34 $0.00 $1.09 <br />HOURLY OPERATOR WAGES Base Fringe F.LC.A. Unempl. Wk.Comp. Total <br />Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 1 <br />Dozer operator (< 70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Mechani $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />~ <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul Operator Total <br /> Machine Attachments CostFhr ($) <br />Single shifts : $57.13 $77.13 $6.71 $32.78 $1 T3.74 <br />Double shifts : $35.44 $77.13 $6.71 $32.93 $152.20 <br />Triple shifts : $28.21 $77.13 $6.71 $33.03 $145.07 <br /> <br />EQUIPMENT PERFORMANCE DATA ~ ~ Horsepower Transmission Weight Length Width Height Fuel Ripper <br /> Description (FHP) Type (UST) (ft) (ft) (ft) type type <br />Dozer : Cat D8R Series 11- 8SU (2 310 NA 41.8 22.7 8.7 11.5 diesel NA <br />Blade: Semi-Universal NA NA 5.4 NA 12.9 5.5 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br /> Total weight : 52.5 (UST) <br />
The URL can be used to link to this page
Your browser does not support the video tag.