Laserfiche WebLink
,:: .." ,: <br />_: _: <br />ItOADAgLE EQUIPMENT sheet 2 of 2 <br />Machine Totai ~ Fleet Size ~ Haul Trip ~ Retum Trip <br />Description ~Cost/hour/unit (No. units) i Cost/hr/fleet ~ Cost/hr/fleet <br /> <br />-._-- f <br /> <br />3 <br />_- <br />_-..__ -_.".~. -____............~.....__ ____._.-._~__...._"~.~...__ _"~~... j.. .- <br />__.___. _.-.-__-__.-.._..............."._._.._-_--. __.-.~~-~__.....-.J..-.~ f <br /> <br /> <br /> f <br /> <br /> i <br />_ _ _ __ _ __ _ __ _ <br />Subtotals : $0.00 $0.00 <br />.. _ _ <br />EQUIPMENT HAUk. DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipmen <br />Haul time (hours) _ 0:18 0. i8 <br />_ <br />Return time (hours) = 0.18 0.18 <br />Loading time (hours) =_ 0.50 _, NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = i.35 0.35 <br />Total non-roadable mob/demob cost ` <br />'two round trips with haul rig <br />Total roadable mob/demob cost ** <br />"one round trip, no haul rig <br />Brighton <br />---~ 0 --------miles <br />40.0 mph <br />$1,803.16 <br />$0.00 <br />. „. <br />_. . <br />J0t3 TIME AND COST Total "ob time : 2.70 hours <br />Total job cost :~~y $1,803 <br />