Laserfiche WebLink
<br />Project: Parkdale Quarry Simulation Run: 100 yr 24 hr <br />1 <br />1 <br /> <br /> <br /> <br /> <br /> <br />~~ <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />i~ <br />Start of Run: 01 Nov2007, 01:00 Basin Model: West Basin 1 <br />End of Run: 02Nov2007, 01:30 Meteorologic Model: 100-yr <br />Compute Time: 05Dec2007, 14:16:00 Control Specifications: Control 1 <br />Volume Units: AC-FT <br />Hydrologic <br />Element Drainage Area <br />(M12) Peak Discharge <br />(CFS) Time of Peak Volume <br />(AC-FT) <br />Basin A 0.2062500 182.3 01 Nov2007, 13:20 24.6 <br />Basin B 0.1710938 138.6 01 Nov2007, 13:20 17.5 <br />Basin C 0.0791405 96.3 01 Nov2007, 13:10 9.5 <br />Basin D 0.0297156 45.7 01 Nov2007, 13:00 3.6 <br />Basin E 0.0341086 42.2 01 Nov2007, 13:10 4.1 <br />Basin F 0.0475257 70.5 01 Nov2007, 13:05 5.7 <br />i~ <br />