Laserfiche WebLink
:~, , <br /> Tallahassere Creek Bridges <br /> 1 Upstream bridge removal 1 Unit 14500 14,500 <br /> 2 Downstream bridge removal 1 Unit 7000 7,000 <br /> 3 Concrete bridge supports (both bridges) 300 CY 12.69 3,807 <br />J 4 Upstream grading/embankment stabilize (3:1) 568.9 CY 1.15 654 <br /> 5 Downstream grading embank stabilize (3:1) 250 CY 1.15 288 <br /> 6 Remove Culvert and earthwork 7407.4 CY 0.85 6,296 <br /> 7 Seed and mulch (both bridge areas) 0.69 Ac 675 466 <br /> 8 Reseed (209'0) 0.138 Ac 675 93 <br /> Railroad Spur <br />K 1 Railroad removal 5200 LF 10 52,000 <br />Total Disturbance Costs 1,134,126 <br />Contractor Mobilization/IDemobilization (8%) 90,730 <br />Overhead(18.59O 209,813 <br />Administration (5~) 56,706 <br />Total Proposed Financial Warranty $ 1,491,376 <br />Disturbed Acreage 72.3 <br />Financial Warranty per acre $ 20,622 <br />Note 1: Temporary structures, pumps, and ancillary equipment is assumed to be removed by the operator or sold to finance <br />removal <br />